The installation of water park equipment is a complex systematic engineering process requiring strict technical compliance. Prior to construction, site surveys and blueprint verification ensure foundational conditions meet load-bearing specifications. During foundation works, C30 concrete is poured for support platforms with embedded high-strength steel connectors. Main equipment installation utilizes laser alignment for slide supports, assembling fiberglass slides and water cannons in modular sequence using dual-sealant joint technology. Concurrently, UPVC piping networks deploy smart filtration systems. Final 72-hour hydraulic tests and safety inspections verify compliance with ASTM standards, with non-slip treatment applied to all edges. Each phase undergoes quality control documentation for operational safety assurance.